8-9-2014 – Original Lab Bench Remaining, All Equipment Moved Outold lab2lab10lab9lab6lab4

 

8-22-2014 – New Plumbing Being Installed3lab193lab18

 

8-18-2014 – Furniture Removed, Floor Removed2lab132lab11

 

8-22-2014 – New Plumbing Being Installed3lab183lab19

 

10-1-2014 – New Plumbing Installed, Electrical Installed4lab224lab20

 

10-2-2014 – Metal Drywall Beams Up, Some Drywall Sheets Up5lab26

 

10-3-2014 – Drywall Sheets Up6lab28

 

10-7-2014 – Plaster Done10-7-14 plaster done10-7-14 plaster done2

 

10-17-2014 – Walls Painted
10-17-14 walls painted

 

10-22-14 – Floor Preparation10-22-14 floor prep10-22-14 floor prep2

 

10-24-14 – Floor Installed 

10-24-14 floor installed210-24-14 floor installed

 

 

10-28-14 – Cabinet Installation Process 10-28-14 cab installation10-28-14 cab installation2 10-28-14 cab installation3

 

12-1-14 – Cabinets Installed, Chairs Built12-1-14 cab installed, chairs built